SURFACE PREPARATION
- To ensure proper adhesion of the product, surfaces must be clean, dry and free from all defective and poorly adhering material, dust, grease, oil, rust, mold or moisture etc.
- For new or porous surfaces apply first the recommended undercoat of product (Step primer, Life dur water, Step plaster)
- Stir well the product and apply on 2 coats
RECOMMENDED PRIMERS
For new or pore surfaces, first apply the recommended primers of the product: Life dur Water , Step Plaster, Monosmoke water or Monosmoke
APPLICATION CONDITIONS
Avoid applying the product at temperatures below 6°C and above 35°C and when the relative humidity is above 70% or if there is a possibility of rain or frost in the next 48 hours.
Adverse conditions and not following the application instructions may alter the final properties of the product.
APPLICATION TOOLS
- Brush
- Roller
- Spray gun
During working keep tools "liquid" in the container. Drain well the product of the tools back in the box and clean immediately with warm water and soap. If product dries, clean only with strong detergents. Do not empty washings into the groundwater.
WARNING: Wear protective gloves/protective clothing/personal protective equipment for eyes/face.In case of contact with eyes, rinse carefully with plenty of water for several minutes. If contact lenses are present, remove them if possible. Continue to rinse.
Call immediately the DETECTION CENTER 210 7793777.
12-16m2 / Lt per coat
First coat: 15% water. Second coat: 5-10% water
1 - 2 hours depending on applying conditions